Architect: MOONBALSSO(Moon Hoon)
Project team: Kim Sookhee, Jang Dukhyun, Kim Taehyeong, Lee byungyeup, Song Juneui
Location: 582, Baekhyeon-dong, Bundang-gu, Seongnam-si, Gyeonggi-do, Korea
Programme: multi use building and multiplex house
Site area: 264.7m²
Building area: 131.74m²
Gross floor area: 435.85m
Building scope: B1, 3F
Parking: 4
Height: 13.68m
Building to land ratio: 49.77%
Floor area ratio: 136.20%
Structure: RC
Exterior finish: exposed concrete
Interior finish: ceramic tile, wallpaper
Structure engineering: POWER
Construction: JEHYO
Mechanical/Electric engineer: Guekdong engineering
Design period: Dec. 2012-Apr. 2013
Construction period: May 2013-May 2014
Budget: 900 million KRW
Client : PLANTYNET Co., Ltd.