Project name : Hydro-electric powerstation, Kempten, Germany
Client : Allgäuer Überlandwerk AÜW, Kempten
Location : Keselstraße 14 a, D - 87435 Kempten / Allgaeu, Bavaria, Germany
Construction period : november 2007 - june 2010
Area in square meters : unknown
Ground-plan area (gross) : approx. 1 040 m²; effective area : approx. 590 m²
Cubature (wrapping construction) : approx. 3865 m³
Project cost : approx. 7,8 Mio. Euro (gross), without powerstation technology
Architecture : becker architekten, Kempten
Projekt team: Michael Becker, Bernhard Kast, Franz G. Schroeck
Structural engineer (underground construction) : RMD Consult, Munich
Structural engineer (building construction) : Konstruktionsgruppe Bauen, Kempten
Consultant building physics : Mueller BBM GmbH, Planegg
Consultant sound protection (underground construction) : TIWAG, Innsbruck (Austria)
Consultant sound protection (building construction) : Tecum, Kempten
Consultant fire protection : IB Reiner Krebs, Dietmannsried
Consultant lightning protection : Kunisch Blitzschutz, Marktoberdorf
Consultant security and health protection : Harald Kopp, Kempten
Mechanical engineering : VA_Tech Escher Wyss GmbH, Ravensburg
Steel construction for hydraulic engineering : Erhard Muhr mbH, Brandenburg